LGA DELTA CENTRAL TERMINAL C (HEAD HOUSE)

Category: Airports | Central Terminal Drive, East Elmhurst, NY 11371

LGA CENTRAL TERMINAL BUILDING C, CONCOURSE G & CONCOURSE E

NEBB CERTIFIED TESTING ADJUSTING AND BALANCING AIR AND HYDRONIC SYSTEMS

& CAMPUS CHILLED WATER AND HOT WATER DATA LOGGING

This $4 billion Delta Air Lines Terminal C project is a critical part of the dramatic redevelopment effort at LaGuardia Airport (LGA). This massive endeavor will consolidate the airline’s operations into a new, 1.3-million-square-foot facility. The project entails the demolition of 600,000-square-feet of existing facilities. Once completed, Terminal C will consist of 37 flexibly sized aircraft gates distributed among four concourses connected by a centralized check-in lobby, security checkpoint, and baggage claim. Dual taxi lanes between the concourses will greatly improve airfield efficiency, resulting in reduced taxi time to and from the gate before take-off and after landing. The facility will offer larger gate areas and more seating, as well as doubling concession space over the existing facilities. There will also be direct access from LaGuardia’s East Parking Garage.

Concourse G

Delta Air Lines has opened the first concourse of its new Terminal C as part of the ongoing $8 billion transformation of Guardia into a unified 21st century airport. The seven new gates in the Delta Air Lines’ Concourse G serve passengers traveling to Boston, Chicago and Washington DC.