Columbia University Campuswide Covid-19 Ventilation Survey

Category: Government,Commissioning,ENG/ Consulting | Columbia University

HVAC – Commissioning & Performance Survey

Columbia University Campuswide Covid-19 Ventilation Study

Airpath completed the air side systems flow verification for the Columbia University Campus, comprising 36 buildings. Airpath provided supply and return total flow per room with ACH calculations based on field measurements. The field engineering team worked with the university to ensure sufficient outside air changes so students and faculty could return to a normal class schedule. A HVAC commissioning tracking log was developed and managed and managed by Airpath to identifying and categorizing issues. This facilitated in the coordination of remediation measures.